TDEC Training Workshop

Level II - Design Principles for Erosion Prevention and Sediment Control for Construction Sites


Agenda

First Day*

8:00 to 8:30am

8:30









10:00


10:15

Noon to 12:45 pm

12:45 pm


2:30

2:45




4:30

Second Day*


7:30 to 8:00 am


8:00


9:45


10:00





11:15


Noon to 12:45 pm

12:45 pm


2:30


2:45

4:15 pm

Section Topic

Registration and Coffee

Introduction -
Design Concepts for EP & SC on Construction Sites; Handouts, Reference Materials, and CD

Storm Water Management Issues; & continued discussion of Design Concepts for E&SC on Construction Sites

Intro to Hydrology - Rainfall & Runnoff

15-min. Break

The Rational Method/Time of Concentration/Examples

Lunch

Curve Number Method & Site Hydrology using TR-55
TR-55 Applications

15-min. Break

Open Channel Flow Hydraulics & Channel Protection
Applications & Design


Adjourn



Coffee & check-in

Soils and Soil Erosion Prediction;
Soil Characteristics

15-min. Break

Revised Universal Soil Loss Equation
RUSLE 1.06B; Applications & Examples

Sedimentation Principles

Overview of Sediment Transport Processes
Examples of sediment sample TSS & turbidity


Lunch

Sediment Pond [SB] Design Principles

15-min. Break

Sediment Pond [SB] Design Example

**Wrap up & Adjourn

Lecturer



Buchanan






Buchanan



Tschantz



Buchanan




Tschantz









Buchanan




Buchanan


Buchanan

Tschantz




Tschantz

 

* Topic & break times are approximate
** Turn in evaluation forms and be sure you have signed in for the second day  
Erosion Prevention & Sediment Control - Level II
Home